Laserfiche WebLink
Town of Reading <br />16 Lowell Street <br />Reading, MA 01867-2683 <br />Phone: 781-942-9012 <br />Fax: 781-942-9071 <br />Email: creilly@ci.reading.ma.us <br />COMMUNITY PLANNING AND DEVELOPMENT COMMISSION <br />CPDC MINUTES <br />Meeting Dated: March 22, 2004 <br />Members Present: Chair, Susan DeMatteo (SD), Neil Sullivan (NS), Jonathan Barnes (JB), <br />Richard Howard (RH). <br />Also Present: Chris Reilly (CR), Town Planner; Joan Langsam (JL), Town Counsel; Peter <br />Hechenbleikner (PH), Town Manager. <br />The Chair called the meeting to order at 7:40 PM. <br />Administrative Review: <br />Summit Village Drainage Bond <br />PH described the problem with the Summit Village drainage and explained that the bond <br />needs to be taken to fix the design. <br />JL advised CPDC to vote to take the bond for nonperformance regarding the drainage. <br />JB moved to take the bond. <br />RH seconded. <br />Voted 4-0, all in favor. <br />Crossing at Walkers Brook <br />Ed Shaw and Attorney Brad Latham represented Walkers Brook Crossing, L.L.C. <br />They requested approval of a minor amendment to the PUD special permit involving changes <br />to a retaining wall and landscaping as necessary to address abutter concerns on the visual <br />impact from the Jordan's/Home Depot building. <br />They have filed with DEP as required for a project change to extend the retaining wall, which <br />would create a 3-1 slope and allow easier long-term landscaping maintenance. <br />The revised plan would alter approximately 75' of sloped area and will not effect the landfill <br />cap. <br />As an incidental effect parking will be increased by about 30 spaces. <br />There were also constructability issues regarding the grading plan that necessitated the <br />revised design; technical engineers came up with the proposed solution. <br />They may also be able to get more treed landscaping in with the revised plan. <br />The detention basin design will be unchanged. <br />RH moved to approve the request for minor modification as outlined in the letter from <br />Attorney Latham, dated March 11, 2004, and shown on drawing C-5, lastly revised March <br />10, 2004, subject to the approval of the Conservation Commission and DEP. <br />JB seconded. <br />Voted 4-0, all in favor. <br />