Laserfiche WebLink
1 ct E <br />Town of Reading CE IV E <br />16 Lowell Street -F OW CLERK <br />Reading, MA 01867-2683 F' L m D I'w G. M ; S S: <br />Phone: 781-942-9012 <br />Fax: 781-942-9071 ~U <br />Email: creilly@d.reading.ma.us UCT ( , 6 <br />COMMUNITY PLANNING AND DEVELOPMENT COMMISSION <br />CPDC MINUTES <br />Meeting Dated: August 23, 2004 <br />Members Present: Acting Chair Jonathan Barnes (JB), Susan DeMatteo (SD), John Sasso <br />(JS). <br />Also Present: Chris Reilly (CR); Town Planner; Joe Delaney (JD), Town Engineer; Peter <br />Hechenbleikner (PH), Town Manager <br />The Chair called the meeting to order at 7:35 PM. <br />Signage Certificate of Appropriateness <br />Cain Oil Trust, 16 & 18 Gould Street <br />John Cain represented the Applicant, Cain Realty Trust. They have submitted <br />a Certificate of Appropriateness application for 3 small, wooden signs on 18 Gould St. and a <br />projecting wooden sign on 16 Gould St. <br />CR explained that the projecting sign is not allowed by the by-law; a directory sign could be <br />installed on 16 Gould St. <br />The signage will be black with gold lettering, per the examples the Applicants submitted and <br />consistent with the instruction CR had given the Applicant on the CPDC design standard for <br />downtown signage. <br />CR would prefer larger signage over the door bays at 18 Gould St. but the signage meets the <br />by-laws. <br />SD moved to approve the Certificate of Appropriateness for 16 and 18 Gould Street, subject <br />to the replacement of the proposed projecting sign with a wall sign, of appropriate <br />dimensions consistent with the Zoning By-Laws, to the wall of 16 Gould St. ` <br />JS seconded. <br />Voted 3-0, all in favor. <br />Subdivision Approval Not Required (ANR) <br />The Crossing at Walkers Brook, Walkers Brook Drive <br />Attorney Brad Latham represented the Applicant, Walkers Brook Crossing, LLC. <br />The Applicant requested to make some minor adjustments to the lot lines at the Crossing at <br />Walkers Brook, in advance of the transfer of Phase 1 ownership from Dickinson to Home <br />Depot and Jordan's. <br />JB moved to endorse the ANR for the Crossing at Walkers Brook, prepared by Vanasse, <br />Hangen, Bruslin, Inc., dated July 29, 2004. <br />SD seconded. <br />