Laserfiche WebLink
Reading Historical Commission Minutes <br />October 25, 2005 <br />Attending: Virginia Adams - Chair Roberta. Sullivan Lt. Col. Wilbar Hoxie , <br />Susan Patterson (acting Secretary) Karen Herrick <br />.u . Yi ,J j. <br />Call to order 7:30pm <br />Past minutes review <br />Discussion postponed <br />Treasurer's Report <br />Warrant signed for $15.08 for cost of photos of 114 and 75 Pleasant St. <br />Reading Common Impact <br />Virginia read the draft letter to the Mass. Highway Dept. aloud. Minor changes in <br />wording and punctuation suggested. Col Hoxie moved to approve revised draft. Roberta <br />seconded. Vote:3-0-0 <br />West St. road reconstruction <br />Virginia read letter from Greenman-Pedersen, Inc. (engineers) giving notification <br />of reconstruction project and requesting comments from RHC. Roberta moved that RHC <br />send a letter in response cautioning sensitivity to the historic nature of the area, including <br />protection of trees, walls and Inventory properties. Also notify of existence of West St. <br />Historic District Commission. Col. Hoxie seconded. Vote:3-0-0 <br />Demo Delay By-law <br />Virginia noted that the letter from RHC outlining its position with regard to the <br />manner and means of enforcing the by-law was sent to town counsel 10-18-05. <br />75 Pleasant St. <br />Virginia and Roberta's research into the street directories provides some evidence <br />that 75 Pleasant was built as a 2-family residence. Walk-through on 10-20-05, with Mark <br />Hall (contractor), Les Brown (architect), David O'Sullivan (architect), lead to following <br />opinions in re handling of the building: Mark Hall recommended either gutting the <br />house, or tearing it down and then replicating it. Les Brown felt the building was a <br />"borderline tear-down" because it doesn't "show" its historic value; there are numerous <br />code violations including stairs, railings, ceiling heights, connected bedrooms. <br />Discussion ensued. <br />Col. Hoxie moved that RHC send a letter to RHA with a recommendation that the <br />RHA look into saving the mature trees on the property and reconfiguring the parking <br />scheme. Seconded by Roberta. Vote:3-0-0 <br />Alternative zoning for historic properties <br />Hard copies of the North Reading and Andover alternative zoning by-laws to be <br />produced and distributed. A proposal for Reading to adopt such a by-law should get on <br />the town warrant as soon as possible. <br />Avon St. subdivision <br />RHC asked to suggest street name. Suggestions: Burnap Way; Benjamin Lane <br />(for Ben Nichols) <br />Other business <br />A grant writing workshop devoted to archives is being offered on 11-8-05. <br />Roberta moved that RHC pay for three people to attend. Virginia seconded. Vote: 3-0-0 <br />Meeting adjourned 9:50pm. <br />