Laserfiche WebLink
CPDC Minutes of 1/26/09 <br />pre-existing plan they submitted showed 30 spaces and. they have not added any more but had only <br />increased the area of the parking lot and. widened the driveway to provide better access for safety <br />reasons. <br />Mr. Rick Schaffer asked if the dimensions of the parking lot and parking spaces match what is <br />currently striped for on the site. No one could answer this but the Chair noted the ZBA had limited- <br />the-number of parking spaces on the site to 30. <br />After much discussion, the Chair summarized what the Board would like to see on a revised plan: <br />• The landscape strip between 16 Sanborn Street and 36 Woburn Street widened by 12 to 18 inches <br />by removing pavement from the 36 Woburn Street side. <br />• A curb added along the length of the 36 Woburn Street side of the landscape strip. <br />• The six head-in parking spaces to the left of the dumpster to be replaced with as many angled <br />parking spaces as would fit. <br />• The first parking space to the right as you enter the site from Woburn Street (space 410 on the <br />-plans) is to be replaced by a curbed landscape area. <br />• Suitable trees (as determined by the Tree Warden) added to the landscape strip between 16 <br />Sanborn Street and 36 Woburn Street and to the new landscape area on Woburn Street (the <br />previous parking lot space #10). <br />• An infiltration system to meet stormwater requirements. <br />• Dumpster to be enclosed_ <br />A member of the public asked if more mature trees could be planted so that screening is provided <br />sooner. The Board and. Town Planner said this may not be possible because of the correspondingly <br />greater size of the root-ball and increased chance of root shock. The Board was willing to give up <br />some height for increased. chance of survival. The Tree Warden should be asked to suggest a species <br />that would grow tallest and broadest in the areas provided. <br />The applicant said they would like to speak with the Tree Warden and a revised plan should be ready <br />by 2/23/2009. <br />NS moved the Board continue the site plan review of 36 Woburn to February 23, 2009 at 7:30 PM. <br />JP seconded. <br />By a vote of 3:0:0, the Board continued the site plan review to 2/23/2009 at 7:30 PM. <br />There would be no further notice of this hearing. <br />Minor Modification to Master Signage Plan <br />580 Main Street, Bank of America <br />Attorney Josh Latham and architect Mr. Gary Davis appeared for Bank of America. <br />The Town Planner distributed a memo from the applicant which contained the plans. <br />The sign will be located within the building's sign-band as per the plaster signage plan but will also: <br />• consist of the individual letters of the words "Bank of America" and the bank's logo. <br />• be in the bank's colors (red, white, and blue). <br />Page 2 of 5 <br />