My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-13 Recreation Committee Minutes
>
Public Access
>
Minutes
>
Recreation Committee
>
2000-2009
>
2007
>
2007-06-13 Recreation Committee Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2010 2:31:13 PM
Creation date
7/26/2010 2:21:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Town of Reading <br />16 Lowell Street <br />Reading, MA 01867-2685 <br />FAX: (781) 942 - 5441 <br />RECREATION DIVISION: (781) 942 - 9075 <br />READING RECREATION COMMITTEE MINUTES <br />June 13th 2007-Town Hall Conference Room <br />Attendance: Frank Driscoll, Rec. Committee Member Bernie Winne, Rec. Committee Member, <br />John Downing, Rec. Committee Chair, Mike DiPietro, Associate Member, Nancy Swain, Rec. <br />Committee Member Kate Kaminer, Rec. Committee Member, John Feudo, Recreation <br />Administrator <br />Guests: Dennis Collins, Peter Coumounduros - Friends of Reading Recreation. <br />J. Downing called the meeting to order at 7:09 PM and asked the committee to review the minutes <br />of May 9th, 2007 <br />B.Winne: Motion to accept minutes of meeting. <br />K. Kaminer: Second <br />Passes: 5-0-0 <br />Public Hearing on Bancroft Ave. Tennis Courts <br />J. Downing opened the Public Hearing for the Bancroft Ave Tennis Courts. J. Feudo stated that all <br />interested parties and abutters have been invited to attend the meeting. <br />In Attendance: Shannon Fratto, Erin Tierney <br />Financing was approved for the project at town meeting on April 30th. The Town Engineer, George <br />Zambouras and the engineering division will oversee the project and has come up with a first rough <br />draft design of the area. The plan is to keep the existing pavement on Bancroft Ave, adding two <br />handicap parking spots on the north end near Morton Field that will lead to three access points to <br />the tennis courts that will be ADA compliant. The grade will come up 12 to 18 inches as minimum <br />to prevent flooding and allow for smooth transition for a wheel chair. The gates will swing wide <br />open for wheelchairs and vehicles for maintenance. There will also be lighting put in around the <br />perimeter of the court five on each side and two on either end. The current asphalt will most likely <br />be pulverized and built upon. There will be benches inside for players for between sets and benches <br />outside the courts for spectators. Because we are applying for a U.S.T.A grant the courts will be <br />built to U.S.T.A tournament size specifications. Major construction will begin in spring '08 as soon <br />as weather allows. J. Downing asked those in attendance for public comment. Erin Tierney stated <br />she has no problem with the project but was concerned with the traffic flow and people speeding <br />down Bancroft Ave. <br />
The URL can be used to link to this page
Your browser does not support the video tag.