Laserfiche WebLink
Town of Reading <br />16 Lowell Street <br />Reading, MA 01867-2685 <br />FAX: (781) 942 - 5441 <br />RECREATION DIVISION: (781) 942 - 9075 <br />READING RECREATION COMMITTEE MINUTES <br />July 11th 2007 Town Hall -Conference Room <br />Attendance: Rec. Committee Chair, Nancy Swain, Rec. Committee Vice Chair Mike DiPietro, Rec. <br />Committee Members: John Downing, Kate Kaminer, Mary Ellen Stolecki, School Committee Rep. <br />Mary Ann Koslowski , Bernie Winne, John Feudo, Recreation Administrator <br />N. Swain called the meeting to order at 7:03 PM <br />B.Winne made a motion to accept the minutes of the Junel3th meeting. <br />J. Dowing: Second the motion. <br />Motion Passes in favor of accepting the minutes: 7-0-0 <br />Administrator's Report <br />Summer programming is running well overall. Summer Camp numbers are growing at a good rate. <br />Girl's program (Basketball and Field Hockey) numbers are down and the boys programs are doing <br />well and continue to grow. We have licensed thirteen camps this year. <br />J. Feudo noted that there was vandalism at Hunt Park that consisted of cash register being stolen <br />and door kicked in at the shack. There was also some anti-Semitic graffiti that really escalates the <br />crime. Friends of Readng Recreation, Friends of Hunt Park and Reading Youth Baseball have <br />offered up a $500 bounty for any information related to the arrest of those that were responsible. <br />The estimated damages are $5500.00. <br />There will be a new playground built at Birch Meadow. There is $25,000 in the capital plan for the <br />project. We have about $40;000 to work with due to insurance money that the town received after a <br />portion of the playground was destroyed in a May storm. The PTO of Birch Meadow might <br />contribute another couple thousand to finish off the project. There will be a rock wall on the Birch <br />Meadow Drive side and it will be 8 ft tall. The rest of the funds from the removal of the portable <br />class rooms will be used for repaving. <br />The turf field at Parker is in the design phase. The town engineers are designing it. The drainage <br />and elevation have been looked at closely and we hope to have this on the Consevation Comm. <br />docket sometime in August and start procurement in September. The goal is for an Aprill st field <br />opening. <br />The lightening policy will be sent to Peter Hechenbleikner and Town Counsel before it is brought <br />back to the Rec. Committee. <br />