My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-25 Climate Advisory Committee Minutes
TownOfReading
>
Public Access
>
Minutes
>
Climate Advisory Committee
>
2020-2029
>
2022
>
2022-05-25 Climate Advisory Committee Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 5:10:38 PM
Creation date
3/8/2023 3:57:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OFgf4a� <br />Town of Reading RECEPVED <br />? Meeting Minutes TOWN CLERK <br />fi^ READING, MA. <br />Board - Committee -Commission -Council: <br />2323 MAR -8 PM 3: 1 <br />Climate Advisory Committee <br />Date: 2022-05-25 Time: 7:00 PM <br />Building: Reading Town Hall Location: Berger Room <br />Address: 16 Lowell Street <br />Purpose: Bi -monthly meeting <br />Attendees: Members - Present: <br />David Zeek, Chair; Ray Porter, Secretary; Celeste Kracke, Member; Genady <br />Pilyaysky, Member; Walt Talbot, Associate Member; Travis Estes, Associate <br />Member; <br />Members - Not Present: <br />Jeff Everson, Member; <br />Others Present: <br />Andrew MacNichol, Reading Staff Planner <br />Alex Roxycke, Reading Engineering <br />Fidel Maltez, Town Manager <br />Gina Snyder, Member Emeritus <br />Minutes Respectfully Submitted By: Ray Porter <br />Topics of Discussion: <br />Meeting was held via a Zoom Conference Call <br />Welcome to Members and Guests <br />Review minutes, vote on acceptance <br />Meeting minutes for 4/27/2022 and 5/11/2022 were reviewed and accepted as amended. <br />Maillet Conservation Stormwater Management <br />• Existing conditions - Blocked culvert, local flooding <br />• Open space improvements - Drainage treatment and storage <br />• Invasive species removal and management <br />• Funding - $100K for design documents, request for early construction funding <br />• Flood plain for 2070 10 year storm <br />• Box culvert blockage under META rail line <br />• Increased on-site storage <br />• Vector potential? Stored water drains in between weather events <br />• Funding though State earmarks, MVP funding and Reading matching funds <br />• Expecting a 2 year construction plan <br />• O&M plan to describe future maintenance <br />Page I I m� <br />
The URL can be used to link to this page
Your browser does not support the video tag.