My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-28 Recreation Committee Minutes - Birch Meadow Working Group
TownOfReading
>
Public Access
>
Minutes
>
Recreation Committee
>
2020-2029
>
2020
>
2020-10-28 Recreation Committee Minutes - Birch Meadow Working Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 1:04:16 PM
Creation date
2/3/2021 10:02:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOIAIP! CLERK <br /> 2,111 NOV -2 PM 2 46 ACTIVITAS <br /> landscape archdecfure civil englneenng <br /> MEETING NOTES <br /> Subject: Working Group Meeting <br /> Project: Town of Reading-Birch Meadow Master Plan <br /> Project No. 20009.00 <br /> Issue Date: 2 November 2020 <br /> Meeting Date: 28 October 2020 <br /> Prepared By: Stephen Crisafulli, Landscape Architect <br /> Attendees: Genevieve Fiorente, Recreation Kevin Bohmiller, Community Services <br /> Ryan Percival, Reading Engineering Mike Wondolowski, Reading Little League <br /> Mark Novak, Activitas Stephen Crisafulli , Activitas <br /> GENERAL <br /> 4.0.01 The following Meeting Notes are compiled from a scheduled master plan <br /> meeting with the Master Plan Working Group,Town of Reading (TOR) and <br /> Activitas (ACT),for the Birch Meadow Master Plan Project. <br /> 4.0.02 The items and comments are not listed in order of the discussion, but are grouped <br /> by topic for easier reference and interpretation. <br /> DISCUSSION <br /> ITEM NO. I ACTION ITEM(New Items In ifolics) <br /> BY/DUE <br /> 4.I DESIGN UPDATES <br /> 4.1.01 Activitas reviewed with the Working Group the updated preferred master <br /> plan design and noted the following changes: <br /> • Flipped the location of the pickleball courts and playground per <br /> earlier discussions. <br /> • Rotated the basketball courts for optimal solar orientation. <br /> • Added discus to the Stadium-Activitas will shift to norther"D" <br /> area to minimize conflicts at the hack finish line. <br /> • Removed the javelin from between Turf 11 and the softball fields- <br /> Activitas has reached out to Tom Zayo for clarification on how <br /> javelin is laid out at the Stadium and update the plan accordingly. <br /> 4.1.02 Activitas has also added conceptual pedestrian and parking lot lighting <br /> throughout most of the site. <br /> 4.2 COST OPINIONS <br /> activuas com 70 Milton street I Dedham. Massachvsetfs 1 02026-2915 17811 326-2600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.