Laserfiche WebLink
Town of Reading <br />16 Lowell Street <br />Reading, MA 01867-2683 <br />Phone: 781-942-6612 <br />Fax: 781-942-9071 <br />Email: ekowralski@ei.reading.ma.us <br />Community Planning and Development Commission <br />CPDC MINUTES <br />Meeting Dated: January 28, 2008 <br />Location: Selectmen's Meeting Room, Town Hall <br />Time: 7:30 PM <br />Members Present: David Tuttle (DT), Secretary; John Sasso (JS), Nicholas Safina (NS), and John <br />Weston (JW). <br />Members Absent: Brant Ballantyne, (BB), Chairman <br />Also Present: Carol Kowalski, Town Planner; and Michael Schloth. <br />Attorney Brad. Latham <br />Mr. Angelo Liani, 295 Salem Street, Woburn MA <br />Pat Black, 18B Carnation Circle <br />Mr. Frank DiPietro, P.E. <br />Mr. John Brzezenski, 60 Terrace Park <br />Ms. Tina Brzezenski, 60 Terrace Park <br />Mr. Branden Holben, Achitect, McHenry Architecture, 4 Market Street, Portsmouth, NH. <br />Mr. Richard Hahn, President Meadowbrook Golf Club <br />Mr. Dario Morelli, Manager, Meadowbrook Golf Club <br />Mr. David Goodemote, 11 Willard Road <br />Mr. Tood.-Fremont Smith, VP of Development, Nordblom Company <br />Mr. Grant Gao, Project Director, Excel Signs, 259 Quincy Avenue, Quincy, MA. <br />As the Chair was not able to attend tonight's meeting, the Secretary served as Chair. <br />There being a quorum the Chair called. the meeting to order at 7:35 PM. <br />Public Comments <br />Representatives of the Nordblom Company, developer of the site on which the Bertucci's and <br />Longhorn restaurants are located (45 and. 39 Walkers Brook Drive respectively), asked to speak to the <br />Board regarding a site grading-mistake that needs correction. <br />Representing The Nordblom Company: VP of Development, Mr. Todd Fremont-Smith; Attorney <br />Brad Latham; Project Engineer Frank DiPietro. <br />Mr. DiPietro said. the curbing and pavement near the building is too high and. needs to be lowered. <br />Their plan is to re-grade this area to slope towards a new catch basin. Mr. DiPietro said they have a <br />site plan and an as-built. The plan showed the area to be re-graded and the location of the new catch <br />basin. Mr. DiPietro said this plan had been reviewed by the Town Engineer who said it looked fine in <br />Page 1 of 8 <br />