Laserfiche WebLink
Town of Reading <br />Meeting Minutes <br />tA'E CEI v`a <br />TOWN CLEM <br />RENDING, M {SS. <br />Board - Committee - Commission - Council: <br />Historical Commission <br />Date: 2017-08-31 <br />Building: Reading Town Hall <br />Address: 16 Lowell Street <br />Z011 SEP -5 A 8 441 <br />Time: 7:30 PM <br />Location: Conference Room <br />Session: Open Session <br />Purpose: Public Hearing & Monthly Meeting Version: Draft <br />Attendees: Members - Present: <br />Jonathan Barnes (JEB) - Treasurer <br />Sharlene Reynolds Santo (SRS) - Secretary <br />Jack Williams (JW) - Member <br />Samantha Couture (SC) - Member <br />Virginia Adams (VA) - Associate Member <br />Members - Not Present: <br />Ron Weston (RW) - Chair <br />Others Present: <br />Peter Maddan (PM), abbutter; Keith Forlizzi (KF), contractor <br />Minutes Respectfully Submitted By: Sharlene Reynolds Santo <br />Topics of Discussion: <br />Public Hearing for 119 Salem St - Called to order at 7:30 pm by SRS who chaired the <br />hearing. In RW's absence, SRS appointed VA as a voting member for the purpose of this <br />hearing and meeting. VA read the legal notice. KF of plans for a two family town house <br />condo development; each with 3 bedrooms, 2-1/2 bath and two car garage underneath the <br />back of the structure. The plans are still evolving plan to change the mudroom windows in <br />the front and are still considering using stones from basement for a stonewall. PM shared <br />that he is happy with driveway that will continue to be a shared driveway. The Plan includes <br />the addition of drainage as previously discussed. The preliminary schedule would probably <br />not be to begin until the spring of 2018. VA mentioned that the property looks in disrepair. <br />JW asked for a '/a -scale elevation plan prior to an early release document and landscape <br />design JEB moved that the presented information is sufficient to make a final determination <br />of the structure at 119 Salem St and that the public hearing be closed. JW seconded. Vote <br />5-0. JEB Moved that the loss of the structure at 119 Salem St would be detrimental to the <br />Town under the purposes of this bylaw (7.2.1) and that a Demolition Delay of up to six (6) <br />months be imposed beginning August 31, 2017. JW seconded Vote 5-0. <br />Fall St Fair - September 10. Not enough members available on that date to help with a <br />table so the RHC will not have a separate display. <br />24 Gould St - Reviewed RW's comments discussing RW's suggestion to have the new <br />building incorporate design aspects of the current building. JW suggested just having a <br />historic display only. Also discussed whether was we need to deal with this detail at this <br />point in the process, but it is important to let the town know that historic structures are <br />important early on for the best outcome for all. JW will work on this document and send out <br />an update; all responses to be sent to RW. Group reviewed changes. <br />USPS Project - VA attended CPDC hearing meeting on August ??; mentioning letter <br />• submitted from the RHC and that was acknowledged. <br />Page 1 1 <br />