Laserfiche WebLink
SFR r <br />wc <br />� ;bl <br />'6'�8r 1NCOR4�p*� <br />Town of Reading <br />Meeting Minutes <br />Board - Committee - Commission - Council: <br />YED <br />Community Planning and Development Commission N11 JAN i � A 8: 31 <br />Date: 2016-11-07 Time: 7:30 PM <br />Building: Reading Town Hall Location: Selectmen Meeting Room <br />Address: 16 Lowell Street Session: <br />Purpose: General Business Version: <br />Attendees: Members - Present: <br />Chair Nick Safina, Dave Tuttle, John Weston, Jeff Hanson <br />Members - Not Present: <br />Karen Goncalves-Dolan <br />Others Present: <br />Community Development Director Julie Mercier, Administrative Assistant <br />Caitlin Saunders, Gretchen and Ron Baker, Peter Shields, Frank Coleman, <br />Kathleen Owen, Adina Weisman, Vis Sankaran, Jack McQuilkin, Brad <br />Latham, Jamie Shaw, Jody Heyward <br />Minutes Respectfully Submitted By: <br />Topics of Discussion: <br />Chair Nick Safina called the meeting to order. <br />Public Hearing, Definitive Subdivision Plan — 'Randall Road Extension' <br />Applicant: Mark G. Hall, 0 Randall Road & 25 Sprincivale Road <br />Jack McQuilkin, P.E., P.L.S. was present on behalf of the application. <br />Mr. McQuilkin described the existing condition of the site and the proposed project. He <br />explained that the Applicant is proposing to extend Randall Road and all existing utilities by <br />approximately 200 feet in order to provide frontage for three new lots. A fourth lot, which <br />has a house on it, will be modified in order to give frontage to one of the Randall Road lots. <br />He noted that the turn -around area at the end of the existing paved road will be removed, <br />and the newly extended road will be capped with a cul-de-sac bulb. <br />The stormwater treatment train will include installation of cultec infiltration chambers <br />connected to the downspouts on each new lot, as well as deep sump catch basins in the <br />road that are tied into a detention pond on Lot 1. Runoff will then flow through a 12" HDPE <br />culvert from the detention pond to forebay and water quality swales on Lot 2 and then into <br />the pocket wetland. Additional road runoff will be treated via Filterra tree box systems in the <br />right-of-way that discharge directly into the pocket wetland on Lot 2. <br />Mr. McQuilkin mentioned that the Commission previously approved a Preliminary <br />Subdivision Plan for this project, and that the Conservation Commission has granted an <br />Order of Resource Area Delineation (ORAD) for the wetlands delineation but still needs to <br />issue an Order of Conditions for the project. He noted that the Conservation Commission <br />site walk is scheduled for the next day. <br />Page 1 1 <br />