My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-04-07 and 19 Reading Housing Authority Minutes - Executive Session
TownOfReading
>
Public Access
>
Minutes
>
Housing Authority
>
1990-1999
>
1994
>
1994-04-07 and 19 Reading Housing Authority Minutes - Executive Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2016 5:37:17 PM
Creation date
7/11/2016 2:31:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
READING HOUSING AUTHORITY <br />Minutes of the Meeting of the Executive Session of A ril 7 and 19, 1994 <br />The Board convened in Executive Session at 8:00 P.M. on Thursday, <br />April 7, 1994, with acting Chairman, Mr. Reynolds presiding; Ms. <br />Galvin and Mr. Allen as quorum. Mr. McIsaac also joined the Board <br />at this point in the meeting. Also in attendance were the Executive <br />Director, Ms. Plansky along with the developer, Mr. Andrew Dol en <br />and his attorney, Mr. Brad Latham. Ms. Sally Hoyt, Reading Se ectperson, <br />was also asked to join the meeting. <br />Mr. Dolben presented an overview of the project which is: <br />- Located on 10 acres of land between Summit Towers and Hopkins <br />Street; <br />- Bear Hill Limited Partnership were only respondents to 3/93 RPF <br />prepared by Town; <br />- P &S has been signed with Town; engineering and site plans have <br />been prepared; question on title issues have been resolved; <br />- Preliminary application prepared for CPDC <br />- Looking for agreement for "inclusionary" language from RHA. <br />- Current proposal is for 11k buildings with 14 units each <br />- The bedroom distribution was proposed to be: <br />1 BR - 30% (48 units); <br />2 BR - 55% (88 units) <br />3 BR - 15% (24 units - Selectmen have reduced this to 0 %) <br />- Units to contain washer /dryer hook -up; gas fireplace, gas heat; <br />electric air conditioning; refrigerator, range, dishwasher, hood <br />but no micorwave units; <br />- Contemporary NE architecture; <br />- Clubhouse and administration building with gym, exercise room, <br />pool and shower /bath areas; <br />- Proposed ballfield for neighborhood use; <br />- Abutters have problem with 160 unit development due to traffic <br />and safety issues which Mr. Dolben felt were unfounded and could <br />be addressed; <br />- Units will be rental to start and will convert to condos as soon <br />as possible (projected 3 -5 years); <br />- Upon conversion to condo will: Tenant buy unit at discount; tenant <br />stay until lease is up; total sell -out will take 2 -3 years; <br />- Normal turnover in apartments is 35 -40% /year; at that time he <br />developer would paint, clean -up and convert for sale; <br />- The reduction in number of 3 BR units is to lessen impact oa schools; <br />The Board discussed several issues: <br />- Viability of project if units are reduced to 100. <br />Mr. Dolben said that the amenities would be eliminated; no bal field <br />for public; no on -site management; project is more attractive nd <br />better maintained with in -house manager. <br />Board proposed several options to the developer for his review: <br />50% of linkage units for first time homebuyers; 50% for RHA as <br />gift; <br />- Units during rental period would be same as language for former <br />Schoolhouse: rental subsidy and if none available, develope would <br />act as subsidizing agency until condo conversion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.