My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-04-27 School Committee Minutes
TownOfReading
>
Public Access
>
Minutes
>
School Committee
>
1990-1999
>
1998
>
1998-04-27 School Committee Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2013 11:00:11 AM
Creation date
12/13/2013 10:50:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
READING SC90CL COMMITTEE <br />Reading, I+ &, isachusetts <br />REGULAR SESSION April.. 27, 1998 <br />Chair Cavicchi called the meeting to order at 5:45 p.m. in the <br />Career Center of RMHS. Present were School Committee MemheKs <br />Cavicchi, Dahl, D'Antona and Stohlman. Also pr�,sent were School <br />Building Committee Member Radville, Superintendent Harutunian and <br />Associate Superintendent Richards. <br />COOLIDGE MIDDLE SCHOOL <br />Dr. Harutunian updated the committee on proposed changes to the <br />Coolidge Middle School renovation project. He advised that the <br />proposed changes add approximately 4,000 square feet to the <br />project. The 4,000 square feet includes one additional classroom <br />and additional storage space. Dr. Harutunian advised that the <br />change was for the RFP process and if the price of the project <br />comes in over the proposed $9 million then the School Committee <br />will have an opportunity to look at the additions and priorit.xe <br />any changes they wish to be made and approve before the package <br />is sent to SBAB. <br />Principal John Doherty made a presentation to the Committee <br />showing where the proposed additional space will be located. <br />School Building Committee member Radville advised the Committee <br />that deduct alternates will need to be determined. The deduct <br />alternates will be used if the project does come in over $9 <br />million, the School Committee can advise the architect what <br />deduct alternates to use. Mr. Radville advised that the storage <br />space that was added is inexpensive space, approximately $35.00 <br />per square foot. <br />Mr. Stohlman stated that he could not find 4,000 extra square <br />feet on the plan and questioned the total. Mr. Stohli ^an also <br />stated that there is a large amount of flexibility built into <br />this plan. <br />Mr. Radville stated the 4,000 square feet was the architecture's <br />estimate, he believed the actual increase in space to be closer <br />to 3,000 square feet. <br />Mr. Dahl made a suggestion about eliminating the unnecessary <br />hallway near the new classroom. <br />
The URL can be used to link to this page
Your browser does not support the video tag.