� ora <br />Town of Reading <br />Meeting Minutes RECEIVER <br />T K <br />'••« EADING. MASS. <br />Board - Committee - Commission - Council: 2013 DEC -9 P Is. 41 <br />Board of Library Trustees And Library Building Committee <br />Date: 2013 -10 -10 Time: 7:00 PM <br />Building: Reading Public Library Location: Community Room <br />Address: 64 Middlesex Avenue <br />Purpose: General Business <br />Attendees: Members - Present: <br />David Hutchinson, Chair; Rachel Baumgartner, Vice -Chair Cherrie Dubois, <br />Secretary, Karen Herrick, Bob LeLacheur, Bob Newton, Greg Stepler, Nancy <br />Twomey, Ruth Urell, Library Director. <br />Members - Not Present: <br />Others Present: <br />Alice Collins, Library Trustee; Vicki Yablonsky, Library Trustee; Evan Warner <br />OPM, STV, Inc.; Joe Huggins, Facilities Director; Barry Berman, Chair, <br />Finance Committee; Amy Lannon, Asst. Library Director <br />Minutes Respectfully Submitted By: Amy Lannon, Assistant Library Director <br />Topics of Discussion: <br />Library Building Update: <br />Mr. Hutchinson reported that contract negotiations have been ongoing with CBT Architects. <br />Town Counsel has advised us on preliminary draft and we hope to finalize terms very soon. <br />Bob Newton, Building Committee, has agreed to work with us to expedite finalizing contract. <br />Mr. Wainer provided update on the temporary space for the library. We received two proposals. <br />Mr. Huggins, Ms. Urell, and Mr. Warner visited both sites and determined one was <br />unsatisfactory, because of floor loading issues and location. Negotiations have been initiated for <br />space at One General Way. We have proposed a smaller space at that location to reduce price. <br />Things are on track to keep to the schedule. <br />Mr. Hutchinson provided a detailed update on project costs from a revised budget estimate from <br />STV based on a construction cost review meeting with Pete Timothy, cost estimator for A. M. <br />Fogarty, and fimther clarification and estimates of so- called "soft costs" including Professional <br />Fees. The architects we not under contract yet and we have had limited input on cogs and <br />design choices as costs to date are based on preliminary information. <br />Mr. Hutchinson described his recommendation - that a budget revision be considered during the <br />architectural design phase that would increase construction costs from the current $9.9 million to <br />address necessary construction and repairs that were either underestimated or not included in the <br />$9.9 million construction estimate. Mr. Wainer, STV, described items that could be addressed as <br />Add Alternates to be bid for construction in a specific priority order. Mr. Hutchinson identified <br />Page 1 1 <br />