Laserfiche WebLink
Town of Reading <br />16 Lowell Street <br />Reading, MA 01867 -2683 <br />Phone: 781- 942 -6612 <br />Fax: 781- 942 -9071 <br />Email: jdelios @ci.reading.ma.us <br />Community Planning and Development Commission <br />CPDC MINUTES <br />Meeting Dated January 14, 2013 <br />Location: Selectmen's Meeting Room <br />Time: 7:30 PM <br />CPDC Members Present: Charlie Adams, Chair; John Weston, Nicholas Safma, David Tuttle, and Jeff <br />Hansen <br />Also Present: Jean Delios Town Planner /Community Services Director and Jessie Wilson, Staff Planner <br />and Recording Secretary <br />Others Present: <br />Megan Young - Tafoya, EDC Member, Reading Resident <br />Angela Binda, Orchard Park Drive <br />Rick Schubert, Winthrop Ave <br />Marleen Wolf, West Street <br />Rich O'Connell, RJO' Connell & Associates <br />Tony D'Arezzo, John Street <br />Bruce Gingrich, Bruce Gingrich Designs <br />Peter Hechenbleikner, Town Manager <br />Bob Connors, Howard Street <br />Bridget Souza, Allen & Major Associates <br />Timothy Williams, Allen & Major Associates <br />Peter Daus - Haberle, Daus - Haberle Design <br />Donna O'Brien, 95 Main Street <br />There being a quorum the Chair called the meeting to order at 7:31 PM. <br />St. Athanasius Parish, 312 Haverhill Street — Continuation of the Public Hearin <br />Ms. Delios reminded the CPDC and public that the CPDC reviewed the project at the previous meeting <br />in December. There were a few outstanding items related to engineering. Ms. Bridget Souza, with Allen <br />& Major Associates, verified that the Town Engineer had some concerns about drainage and that the <br />CPDC wanted a memo from the Town Engineer regarding the revised plans. He sent a memo last week <br />with some conditions to include into the Site Plan Review decision including more detail on the new <br />driveway. In addition, the Town Engineer indicated they will need approval for the curb cuts from the <br />Board of Selectmen (BOS), which we hope to move forward with after this meeting. <br />Mr. Tuttle told the CPDC he drove by the site and the proposed plan seems to work well. Mr. Weston <br />agreed with Ms. Souza, recalling that there was a short turnaround time for the Town Engineer to review <br />the revised plans. There was some question regarding the stormwater calculations and the CPDC <br />continued the meeting to make sure engineering approved the revised plans. <br />Page 1 of 9 <br />